Description

Drop Heads which can be used with H20 Beams in the scaffolding and slab formwork system makes the installation of slab formwork both easier and faster. Cross shaped heads are placed on the scaffolding system and H20 wooden beams are placed in the main direction on the lower side if desired; in the secondary direction on the upper side regarding the load of the slab and the thickness of plywood. Furthermore, because this is a drophead system, the slab formwork can be removed wıthin 2 days after pouring. Because of this feature, the investment required in total formwork can be greatly reduced. Meaning that with the purchase of a little extra cuplock scaffolding, greater slab pouring speeds can be achieved.